Environmental protection in Wuhu Oasis
Overview of the owner: Wuhu Oasis Environmental Protection and energy Co., Ltd., zheneng Jinjiang Group garbage power plant Project time: January 2025 Project content: new Lide cb3-3.43/ 1.75/ 1 Replace NAC c6-3.43/0.98 Scope of work: construction drawing design, old unit removal, new unit design, manufacturing, installation, commissioning, civil engineering transformation, pipeline transformation, instrument control system transformation, generator recycling, electrical system transformation. Duration: less than 6 months from project startup to grid connection |