Hangzhou Xiaoshan lvneng

image.png

image.png

User name: Hangzhou Xiaoshan lvneng

Project location: Hangzhou, Zhejiang

Project background: garbage power plant, 3 sets of 600t/h medium temperature and medium pressure fluidized bed boilers, 3 sets of N12 steam turbine units. The amount of garbage is insufficient, and the load of steam turbine generator unit is less than 50%. Unable to meet the auxiliary power supply, or even reverse power transmission; Unit technical transformation: low efficiency n12- high efficiency high speed n5.5, more power generation +15%.

Operation date: May, 2025

Model: n5.5-3.1/400

Dragging equipment: generator

Application field: waste power generation

Features: high speed pure condenser, lower exhaust, non regulating steam extraction port to low pressure heater and low pressure removal, system thermal efficiency is improved. Small general contracting: demolition of the original machine, design, manufacture, installation and commissioning of new machines, civil engineering transformation, pipeline transformation, instrument control transformation, and electrical reuse.

Technical Support: 杭州数企聚变科技有限公司 | Admin Login
seo seo