Hubei Xinyi chemical
User name: Hubei Xinyi chemical Project location: Yichang, Hubei Province Project background: the new 10MW condensing steam turbine generator set in the chemical plant is used to generate electricity by synthetic transformation waste heat, which meets the requirements of industrial policies and energy conservation and emission reduction. Operation date: February 2024 Model: n10-1.5/270 Dragging equipment: generator Application field: Chemical Industry Features: waste heat power generation in chemical industry, upper exhaust steam, single-layer quick installation layout; EPC general contracting, construction drawing design, complete equipment and procurement, construction and installation, system commissioning, completion acceptance, training services, and the project duration is 5 months |